Case study · Thermostatic

Rapid prototyping: rubber plug & diaphragm in 12 days

A leading thermostatic-products manufacturer in the United States needed a fast design change to improve actuator performance.

  • IndustryThermostatic
  • ComponentRubber plug & diaphragm
  • MaterialRubber (plug & diaphragm)
  • RegionUnited States

Overview

After initial approval of a new rubber plug and diaphragm, the client wanted to improve the actuator's performance — which meant a challenging design change to a three-step plug geometry.

Harkesh executed the sample development from drawing to dispatch in just 12 days, resolving the change quickly. The entire project moved to the new plug design.

12 daysdrawing to dispatch
2→3steps on the redesigned plug
100%of the project shifted to the new design

Key outcome:

A challenging three-step plug redesign taken from drawing to dispatch in just 12 days — fast enough to move the whole project to the new design.

The challenge

A late design change to improve the actuator

The client had embarked on a new project requiring a rubber plug and diaphragm. However, after initial approval, they wanted to improve the performance of the actuator.

That meant a design change — and a tight timeline to keep the project moving.

Our approach

A tougher geometry, executed fast

A design change was made to have three different steps on the plug instead of two. This was a challenging geometry and the tool design was critical.

Our team prioritised the tooling and sample development to turn the change around quickly without compromising quality.

The results

Drawing to dispatch in 12 days

Fast turnaround

12 days end to end

We executed the sample development from drawing to dispatch within 12 days.

Tooling

Challenging geometry solved

The redesigned three-step plug demanded critical tool design, which our team delivered under a tight timeline.

Outcome

Whole project switched

Our fast development resolved the change quickly and the entire project shifted to the new plug design.

We successfully executed the sample development from drawing to dispatch within 12 days. Our fast development helped resolve the change quickly, and the entire project was shifted to the new plug design.

Materials & application

Where this part fits

Application details

  • Rubber plug and diaphragm for a thermostatic actuator
  • Late-stage design change to improve performance
  • Three-step plug geometry with critical tooling
  • Rapid prototyping from drawing to dispatch

At a glance

Industry
Thermostatic products
Component
Rubber plug & diaphragm
Design change
2 → 3 step plug
Turnaround
12 days drawing-to-dispatch

Questions, answered

Frequently asked

For this thermostatic plug and diaphragm, we executed the sample development from drawing to dispatch in 12 days — including a challenging three-step plug redesign and critical tooling.

The client wanted to improve the actuator's performance after initial approval. Moving from a two-step to a three-step plug geometry achieved that, though it made the tool design more challenging.

No. We prioritise tooling and sample development to compress the timeline, but the parts still meet the same quality and dimensional standards — here, the whole project moved to the new design on the strength of the prototype.

Get In Touch contact section

Get In Touch

Address

Mumbai Office: Harkesh Rubber LLP, 108, Adarsh Industrial Estate, Sahar Road, Chakala, Andheri (East), Mumbai 400099

General Enquiries

contact@harkeshrubber.com

Business Phone

+91-22-40060400

Contact Form

Get In Touch

Share your requirements and our team will respond shortly.

Keep exploring

More case studies